Overhauling a contrabassoon!
March 5th, 2020
![Over 16 feet of maple and metal contrabassoon tubing being overhauled in the Double Reed Ltd. bassoon workshop!](/media/113917/contra2-6.png?crop=0,0,0,0&cropmode=percentage&width=924&height=572&rnd=132278812280000000)
Over 16 feet of maple and metal contrabassoon tubing being overhauled in the Double Reed Ltd. bassoon workshop!
Overhauling a contrabassoon!
Over 16 feet of maple and metal contrabassoon tubing and keywork being overhauled in the Double Reed Ltd. bassoon workshop!
![](/media/1671/schreiber_805_trans.png?width=169&height=188)
![](/media/1580/repairs_818.png?width=169&height=188)
![](/media/1718/repairs_825_cropped.png?width=169&height=188)